Toolbeltby CrewcraftStart free
All guides
ElectricalElectrical·Oct 26, 2026·7 min read

Quoting standby generator installs before the first outage

By Stefan · founder, Toolbelt by Crewcraft

Standby generator work has a strange shape: demand spikes immediately after an outage, when lead times are longest and everyone is quoting. The jobs that go smoothly — and profitably — are nearly always quoted in the quiet weeks before.

Size it from the real load, not the brochure

The first decision is whole-house or essential circuits, and it drives everything downstream. Most homeowners say whole-house and mean “the fridge, the furnace, some lights and the well pump.”

Run the load calculation properly. A 22kW unit where 14kW would serve the circuits they actually care about is several thousand dollars of equipment and a bigger gas line for no benefit — and the homeowner will feel sold to when the next quote comes in lower.

The line items that get missed

  • The gas line. Frequently the single largest surprise. Existing meter capacity, run length and pressure all matter, and an undersized supply will not start the unit under load. Confirm with the utility before you quote, not after.
  • The pad. Concrete or composite, plus site prep and levelling.
  • The transfer switch — automatic vs manual, and the service rating. A service upgrade hiding behind it changes the job completely.
  • Trenching for the conductors and the gas line. Price per foot, and state the assumption about what is under the lawn.
  • Permits and inspections — usually electrical and gas, sometimes mechanical, occasionally zoning for placement.
  • Setback compliance. Distance from windows, doors, vents and the property line. Getting this wrong means moving a unit that is already bolted down.
  • Commissioning — load bank test, exercise schedule, and walking the homeowner through it.

Quote the ongoing cost too

A generator needs an annual service and a weekly self-test. Say so in the quote, with the service price. It prevents the “nobody told me” conversation in year two and it sets up a recurring visit you can actually schedule.

Give them three tiers

Essential circuits, extended, whole-house — same page, three numbers. At this price point homeowners want to understand the trade-off rather than be handed a single figure. Tiered quotes also move the discussion from “is this too much” to “which one,” and they quietly raise the average sale.

Why October beats January

After a major outage, equipment lead times stretch to months, installers are booked, and the homeowner is comparing four quotes while frustrated. Before the season, you are competing with nobody, you can promise a date you will hit, and the customer is making a considered decision rather than a panicked one. The same job is worth more and goes better.

Quote it from the driveway

Toolbelt drafts the line items from a plain description and your own rates, gives you good/better/best tiers in one tap, and sends a branded, e-signable quote with a deposit button on it before you leave. The Load Calc Helper gives you a quick service-load sanity check first. Three free estimates, no card.

See also quoting a 200A panel upgrade and how to write an electrical estimate. Or Toolbelt for electrical.

Toolbelt does the paperwork this guide describes.

Describe the job in plain English — get an itemized, branded estimate the customer can e-sign and pay a deposit on, in about a minute. Built for HVAC, plumbing, electrical and roofing.

No credit card · 3 free estimates · Built for the trades